| Project | Steel Frame Building "La Forge De L'Isle" |  |
 |  | For a customer in French-Guyana VSH is to fabricate and supply a galvanized steel structure for a mix use building (office and warehouse). The total weight is approx. 22 metric tons. Important aspect is that this is the first galvanized steel structure to be fabricated by VSH for one of the French territories | Owner La Forge De L'Isle
Architect IET
Engineer IET
Steel tonnage 21.7 metric tonnes
nv VSH Staalmij. customer La Forge De L'Isle
|

| Project | NGC-NEO Tobago Pipelines Project |  |
 | .jpg) | VSH is to fabricate and to supply 204 metric tons of hot dip galvanized pipe rack steel structures for the National Gas Co. of Trinidad & Tobago for the new to build onshore installation. The general contractor on this project is Trinidad based Carillion (Caribbean) Ltd. for which company VSH has supplied several medium and heavy gauge steel structures in the past few years. The total value is approx. US$ 900,000.- and the production and delivery delay takes approx. 12 - 14 weeks. | Owner NGC-NEO Trinidad & Tobago
Architect Technip
Engineer Technip
Steel tonnage 204 metric tonnes
nv VSH Staalmij. customer Carillion (Caribbean) Ltd.
|

| Project | National Meat Processing Plant |  |
 | ![National Meat Processing Plant]() | "National Meat Processing Plant" Beausejour-Vieux Fort, St. Lucia (W.I.), hot dip galvanized steel structure for the new to build abattoir in St. Lucia. General contractor is Colombette Construction Inc., Owner is the Ministry of Agriculture, Land, Fisheries and Forestry St. Lucia (W.I.) | Owner Ministry of Agriculture, Land, Fisheries and Forestry St. Lucia (W.I.)
Architect Isle Isle
Engineer United Suriname Steel Company
Steel tonnage 81 Metric tonnes
nv VSH Staalmij. customer Colombette Construction Inc.
|

| Project | NGC Sump Pump |  |
 | ![NGC Sump Pump]() | NGC Sump Pump Additional steel parts to the NGC North East Offshore Project Tobago. Owner is National Gas Co. of Trinidad & Tobago, genereal contractor is Carillion (Caribbean) Ltd., engineering by Technip USA LLC. | Owner National Gas Co. of Trinidad & Tobago
Architect Technip USA LLC
Engineer Technip USA LLC
Steel tonnage 1.7 Netric tonnes
nv VSH Staalmij. customer Carillion (Caribbean) Ltd.
|

| Project | Princess Hotel Casino |  |
 | ![Princess Hotel Casino]() | A 5 storey Hotel and a 6 storey Casino Building to build at the Kleine Waterstraat, Paramaribo, Suriname. Owner is Princess Hotel Casino, general contracor is Ravin Construction N.V., engineering United Suriname Steel Company and Rick Brautigan Architecture Inc. | Owner Princess Hotel Casino Suriname
Engineer United Suriname Steel Company & Rick Brautigan Architecture Inc.
Steel tonnage 585 Metric tonnes
nv VSH Staalmij. customer Ravin Constructions N.V.
|

| Project | Ace Hardware Centre |  |
 |  | This is the second Ace Hardware Centre in St. Maarten. The engineering was carried out by ICE Consulting Engineers in St. Maarten. The General contractor is Taliesin Construction N.V. of St.Maarten. Production of the steel superstructure took place Q4 2006. | Owner Yousef A. Yousef
Architect ICE Consulting Engineers
Engineer ICE Consulting Engineers
Steel tonnage 408 metric tonnes
nv VSH Staalmij. customer Ace Hardware Centre
|

| Project | Bay Walk Shopping Mall |  |
 | .jpg) | The Bay Walk Shopping Mall in Rodney Bay, Gros Islet St.Lucia (W.-I.) will be one of the biggests buildings in Rodney Bay upon its completion. The architect is Lane Pettigrew Associates from Miami (FL). and the general contractor is WillWin Ltd. St.Lucia, a subsidiary of the C.O.Williams Group of Companies located in both Barbados and St.Lucia (W.-I.). Production of the steel superstructure was completed on February 2009. | Owner Hebah Ltd.
Architect Lane Pettigrew Associates
Engineer Paul Hippolyte Associates
Steel tonnage 940 metric tonnes
nv VSH Staalmij. customer Willwin Ltd. St. Lucia
|

| Project | By Walk Parking Garage |  |
 | .jpg) | Next to the Bay Walk Shopping Mall in Rodney Bay, Gros Islet St.Lucia (W.-I.) a parking building in steel will be erected. The building consists of five parking levels and two apartment levels on top. The architect is Lane Pettigrew Associates from Miami (FL). The structural engineering has been carried out in house and the general contractor is WillWin Ltd. St.Lucia, a subsidiary of the C.O.Williams Group of Companies located in both Barbados and St.Lucia (W.-I.). Production of the steel superstructure was completed in Q42008. | Owner Hebah Ltd.
Architect Lane Pettigrew Associates
Engineer Paul Hippolyte Associates
Steel tonnage 430 metric tons
nv VSH Staalmij. customer WillWin Ltd. St.Lucia (W.-I.)
|

| Project | Courtyard by Mariott Hotel |  |
 |  | The 6-storey steel superstructure for the first Courtyard by Marriott Hotel in Suriname (S-Am.) was re-engineered, produced and erected complete with Quickspan® Hollowcore pre-stressed concrete floor slabs. Architectural design was carried out by Zürcher Arquitectos from Costa Rica and the first structural engineering was carried out by Grupo I.E.C.A., also from Costa Rica. Grand opening is expected in the first half of 2009. | Architect Grupo I.C.E.A.
Engineer Grupo I.C.E.A.
Steel tonnage 420 metric tonnes
nv VSH Staalmij. customer Twin Hotels N.V.
|

| Project | Multiplex Theatre |  |
 | .jpg) | The Multiplex Theatre in Paramaribo Suriname (S-Am.) has been completely engineered in-house. It consists of five movie theatres with a total of 750 seats. At ground level there will be shops and restaurants, the attic level will house office spaces. A structural cross-check was carried out by IMd Consulting Engineers from The Netherlands. The architect is Jim Klinkhamer Associates from The Netherlands, a renowned Dutch theatre architect. Erection was completed in September 2008. | Owner T.B.L. Multiplex N.V.
Architect Jim Klinkhamer Associates
Engineer Imd / VSH
Steel tonnage 327 metric tonnes
nv VSH Staalmij. customer T.B.L. Multiplex N.V.
|

| Project | G.G.I.L. Office |  |
 |  | This 9-storey building consists of two basement parking decks and seven storeys of free office space. The free bays are 27x27ft. wide. The architect is Barry Franceschi Architects from Trinidad and the structural engineering has been carried out by Kemsob Engineering Services Ltd. also from Trinidad. The general contractor for this project is Carillion (Caribbean) Construction Ltd. Erection was completed in Q12009. | Owner R.G.M. Development
Architect Barry Franceschi Architects
Engineer Kemsob Engineering Services Ltd. /Exeqtech Consultants
Steel tonnage 600 metric tonnes
nv VSH Staalmij. customer Carillion (Caribbean) Ltd. Trinidad
|

|
 |